Re bed and Re point completed in Bibaringa with brown flexi
280 tiles changed and 40 ridge caps replaced
Before

All old sand and cement chipped off and edges of ridge caps grinded. Ridge caps placed back into position ready for re bed and re point

Re bedded and re pointed to Brown

Before
Ridge caps removed and old sand and cement chipped off and edges of ridge caps grinded.
Ridge caps placed back into position ready for re bed and re point.

Ridge caps removed and old sand and cement chipped off and edges of ridge caps grinded.
Ridge caps placed back into position ready for re bed and re point.

Re bedded and re pointed to Brown

