This roof had tin tiles and an old iron roof underneath, they were both removed and roll out insulation was installed along with new Zincalume sheeting. Before: After: Before: After:
Roof Restoration completed to Wilderness
Before: Pressure cleaned and all broken tiles replaced Edges of ridge caps removed and edges grinded. Re bedded and re pointed ready for painting: Painted 4 coats to Wilderness 1st coat Primerbond Roof Restore 2nd coat Primerbond High Build 3rd coat Crc Membrane to Wilderness 4th coat Crc Membrane to Wilderness Before: Pressure cleaned and all broken tiles replaced Edges …
- Page 2 of 2
- 1
- 2
